Several Classroom Additions were added, wrapping around the existing school building and connecting to existing corridors:
Phase One (1998): Six classrooms, mechanical room, and re-roofing the existing building.
Phase Two (2005): Five classrooms; one as a laboratory, plus a staff lounge, and restrooms.
Phase Three (2007): Six classrooms.
Phase Four (2010): Six classooms, including special education offices, and Jr. High administrative office.
This project included the addition of a new gymnasium, gym storage, concessions, locker rooms, public restrooms, mechanical room, and expanded band room.